651.344.1849 | 2307 Buffalo St, White Bear Township, MN 55110 | tim@edeck.net
Description
Build New 14 by 12 deck on rear of house, about 5-6' feet high; add stairs to existing concrete pad.
tear down existing deck optional: add $250 for this haul away existing deck optional: add $250 for this
Build new deck approximately ft. by ft.
Framing
varies less than 30" 3 ft 4 ft 5 ft 6 ft 7 ft 8 ft 9 ft 10 ft 11 ft over 11 ft high; 6x6 AC2 Treated 4x4 AC2 Treated 6x6 cedar rough sawn 4x4 cedar supporting Posts; (2) 2x10 (3) 2x10 (2) 2x12 (3) 2x12 See plan Beams; 2x10 2x8 See Plan AC2 Treated Joists; 12" 13.5" 16" joist spacing, Cantilevered;
OPTIONS: hot tub support fascia trim none 1x12 rough sawn cedar 5/8" x 11 composite trim masonry lapsiding 3/4" x 12 PVC Trimpak boards 12" Westech Vinyl Fascia
Decking parallel to patio door diagonally to patio door
OPTIONS: upgrade to composite decking (Trex) for $ fascia trim none 1x12 rough sawn cedar 5/8" x 11 composite trim masonry lapsiding 3/4" x 12 PVC Trimpak boards 12" Westech Vinyl Fascia
Railing Custom none 4x4 cedar 4x4 AC2 Treated 4x4 AC2 w/Composite Sleeves 6x6 AC2 Treated 6x6 rough sawn cedar Timbertech™ Composite System Trex™ Composite System Posts; spaced 4-6 feet; none 2x2 AC2 Treated 2x2 cedar Aluminum Aluminum turned Alum. Turned every other Alum. Turned every third Spindles; spaced 4 inches, Attached to Fascia Attached to Bottom Rail none 2x4 AC2 Treated 2x6 AC2 Treated 2x4 Cedar 2x6 Cedar 2x4 Composite 2x6 Composite Toprail;
OPTIONS: bottom rail optional, add $162 upgrade to aluminum spindles (includes necessary bottom rail) add $648 fascia trim is included in cedar decks none 1x12 rough sawn cedar 5/8" x 11 composite trim masonry lapsiding 3/4" x 12 PVC Trimpak boards 12" Westech Vinyl Fascia
Vinyl rail upgrade is $ $
Composite rail upgrade is $ $
DATE: July 19, 2011 1-NAMES OF ALL OWNERS (YOU): 2-OWNER'S MAILING ADDRESS: same as shown above, or 3-OWNERS SOCIAL SECURITY NUMBER: (ownership of property must be verified): 4-OWNER'S TELEPHONE: 5-JOB LOCATION same as shown above, or , if different than owner's mailing address:
YOU AND TIM COPELAND CONSTRUCTION (BUILDER) AGREE AS FOLLOWS:
1) Builder agrees to perform the following work (attach plans dated, and specifications dated, if any, to this Contract):
Build/install a deck as previously bid at $______ by mail or personal delivery.
You agree to pay Builder $_______ for this work as follows:
50% of this amount to start project due at time of lumber delivery, 50% upon completion and inspection by city of deck.
The price for the work includes all labor, materials, and the building permits unless indicated separately on the bid.
You agree to provide electricity; water to mix cement with; a place to dispose of excavated dirt that can be accessed reasonably with a wheelbarrow.
You will get the money to pay the Builder from the work from: Personal Checking Business Checking Home Equity Loan Cash Savings
2) You may not occupy or use any of the work done by the Builder until the Builder has been paid in full. All work is considered completed upon Inspection by City Building Official. If no permit is required, the Builder will determine when the work is complete.
3) The Builder agrees to start work on or before ( a spare week is allowed here from the actual scheduled start date, to accommodate unforeseen circumstances) and all work will be completed within 30 days (most decks are complete within 8 days; this is merely generic statement for the sake of this contract form). You will agree that the Builder is not responsible for delays in completion of the work due to weather, strikes, war, shortage or delay in getting materials, government regulations, court actions or any other cause beyond the Builder's control. You agree to pay for unexpected or unanticipated extra costs such as soil corrections, inferior attachment area on your house, or removal of debris that is buried and is preventing the installation of the footings.
4) Builder will provide Builder's risk insurance in the amount of this Contract. You will be responsible for losses not covered by Builder's Insurance, including any deductable.
5) If you fail to pay the Builder any payments due under the terms of this Contract within 3 days of the written request for payment, the Builder may stop work without further notice. You will be liable to Builder for all payments due up to the time work is stopped, and for all losses, soft costs, and damages. The Builder will only restart work after you have paid all money due the Builder and the Builder is satisfied that you have the ability to pay for the remaining work.
If at any time the Builder reasonably believes that you will not have sufficient funds to pay the Builder any payment scheduled to be due under this Contract, after 1 day written notice to you, the Builder may stop work. If you provide the Builder with evidence, satisfactory to the Builder, of your ability to meet all payment obligations, Builder may continue work under the Contract. If work has stopped for any reason, for more than 10 days, Builder may terminate this Contract and recover from you, payment for all work completed, and for all lossses sustained by the Builder on all material, machinery, equipment or tools, overhead, soft cost, profit and damages.
6) You and the Builder have agreed that you will do the following work: . Provide water & electric source outside, specify and provide place on property to place excavated dirt from installation of footings.
You understand that this work must be done on time, as determined by the Builder, or you agree to pay the Builder all costs for any delay caused by you.
7) You understand that there are no oral agreements between you and Builder. Everything you expect Builder to do has been included, in writing, in this Contract. Nothing in this contract can be changed unless it is changed in writing, in this Contract. Nothing in this Contract can be changed unless it is changed in writing on a separate form and signed by both you and Builder. This Contract may be NOT be assigned by Builder without your consent.
8) If Builder is required to retain an attorney to collect any money you owe, you agree to pay all the Builder's attorney fees, costs, and disbursements. At Builder's option, and if requested by Builder, you agree to arbitrate and/or mediate any disputes between us in Ramsey County, Minnesota, under the Rules of the American Arbitration Association, Minneapolis, Minnesota.
9) Your signature on this Contract attests to your financial responsibility, ability, and willingness to pay in accordance with the terms of this Contract. You represent to the Builder that you have no plans to file bankruptcy or seek other protection from your creditors, that all information in this Contract is correct, and that you have read and understand this Contract. You represent and warrant to Builder that you are the owner of the property on which the Builder will do the work.
10) THE OWNER IS ADVISED THAT IF THE PROJECT INVOLVES THE OWNER'S HOMESTEAD, FEDERAL LAW ALLOWS THE OWNER TO TERMINATE THIS CONTRACT FOR ANY REASON WITHIN THREE (3) DAYS AFTER SIGNING IT.
11) The Pre-lien notice required to be given by Minnesota State Law is attached (if applicable). Also attached is the Urea Formaldehyde Notice. All warranties under Minnesota Statutes Chapter 327A apply to the work.
THIS IS A LEGALLY BINDING DOCUMENT. READ IT CAREFULLY AND UNDERSTAND IT BEFORE YOU SIGN IT. CONSULT AN ATTORNEY IF YOU HAVE QUESTIONS. I have read and understand this agreement (place initials in box). All Owners must sign.
____________________________(owner) (enter name)
____________________________(owner) (enter name2)
Warranty Information
Here are the IMPLIED warrantees that are imposed upon construction by the State of Minnesota (Minn Stat. §327A.01, et. seq.)
Things to know:
Expect that joints that look completely tight when I finish will not necessarily stay that way. Wood shrinks and twists slightly within an acceptable tolerance. Because I use glue on these connections, the chances are small that you would have a problem. But if you do, I will fix it for a period of five years.
(Tim Copeland, MN license #20075977)